BACKGROUND
Figure B-1 TMEP Figure 1 Regional Location
TABLE B-1 TECHNICAL DETAILS – ALL PIPELINE SEGMENTS
1.0 INTRODUCTION
1.1 Purpose
1.2 Roles and Responsibilities for Environmental Compliance
1.2.1 Accountability
1.2.2 Decision-Making Process
1.2.3 Emergency Response Plans
Figure 1.2-1 Environmental Compliance Organizational Chart
TABLE 1.1-1 PROPOSED PIPELINE CONSTRUCTION SCHEDULE
TABLE 1.2-1 ROLES AND RESPONSIBILITIES
2.0 ENVIRONMENTAL PROTECTION PLAN ORGANIZATION
2.1 Organization
2.2 Limitations of the Pipeline Environmental Protection Plan
3.0 ENVIRONMENTAL COMPLIANCE
4.0 NOTIFICATION OF INTERESTED PARTIES
5.0 ENVIRONMENTAL OVERVIEW
5.1 Environmental Setting
5.2 Non-Routine Mitigation
5.3 Permits, Approvals and Authorizations
TABLE 5.2-1 UNIQUE ISSUES REQUIRING NON-ROUTINE MITIGATION
TABLE 5.3-1 POTENTIAL FEDERAL ENVIRONMENTAL PERMITS/APPROVALS/AUTHORIZATIONS
TABLE 5.3-2 POTENTIAL PROVINCIAL ENVIRONMENTAL PERMITS/APPROVALS/AUTHORIZATIONS
6.0 PRE-CONSTRUCTION ACTIVITIES
7.0 GENERAL PIPELINE CONSTRUCTION MITIGATION MEASURES
8.0 PIPELINE-SPECIFIC CONSTRUCTION MITIGATION MEASURES
8.1 Clearing and Disposal
8.2 Topsoil/Root Zone Material Handling and Grading
8.3 Stringing, Welding, Trenching and Lowering-In
8.4 Backfilling
8.5 Hydrostatic Testing
8.6 Construction Clean-Up and Reclamation
8.6.1 General Measures
8.6.2 Rough Clean-Up
8.6.3 Final Clean-Up/Reclamation
8.7 Water Crossings
8.7.1 General Measures
8.7.2 Temporary Vehicle/Equipment Crossings
8.7.3 Watercourse Crossings
8.7.4 Wetland Crossings
TABLE 8.1-1 TIMBER SALVAGE REQUIREMENTS ALBERTA
TABLE 8.1-2 TIMBER SALVAGE REQUIREMENTS BC
9.0 ACCESS ROADS FOR PIPELINES
10.0 TEMPORARY CONSTRUCTION CAMPS
11.0 BORROW SITES
12.0 ANCILLARY SITES
13.0 REFERENCES
13.1 Personal Communications
13.2 Literature Cited
APPENDIX A CHECKLIST
APPENDIX B CONTINGENCY PLANS
APPENDIX C MANAGEMENT PLANS
APPENDIX D CONTACTS
TABLE D-1 EMERGENCY CONTACTS
APPENDIX E TERRAIN FEATURES (RESOURCE-SPECIFIC MITIGATION)
TABLE E-1 RESOURCE-SPECIFIC MITIGATION MEASURES FORTERRAIN FEATURES ENCOUNTERED WITHIN THE PIPELINE CORRIDOR
APPENDIX F SOILS (RESOURCE-SPECIFIC MITIGATION)
TABLE F-1RESOURCE-SPECIFIC MITIGATION MEASURES FOR SOIL CHARACTERISTICSENCOUNTERED BY THE PIPELINE CORRIDOR IN ALBERTA
TABLE F-2RESOURCE-SPECIFIC MITIGATION MEASURES FOR SOIL CHARACTERISTICSENCOUNTERED BY THE PIPELINE CORRIDOR IN BRITISH COLUMBIA
APPENDIX G HYDROLOGY (RESOURCE-SPECIFIC MITIGATION)
TABLE G-1RESOURCE-SPECIFIC MITIGATION MEASURES FOR HYDROLOGIC FEATURES ENCOUNTERED WITHIN THE PIPELINE CORRIDOR
APPENDIX H WATER QUALITY (RESOURCE-SPECIFIC MITIGATION)
TABLE H-1 RESOURCE-SPECIFIC MITIGATION MEASURES FOR WATER QUALITYFEATURES ENCOUNTERED WITHIN THE PIPELINE CORRIDOR
APPENDIX I AQUATIC RESOURCES (RESOURCE-SPECIFIC MITIGATION)
TABLE I-1 SITE-SPECIFIC MITIGATATION MEASURES FOR WATERCOURSES ENCOUNTERED WITHIN THE PIPELINE CORRIDOR IN ALBERTA
TABLE I-2 SITE-SPECIFIC MITIGATION MEASURES FOR WATERCOURSES ENCOUNTERED WITHIN THE PIPELINE CORRIDOR IN BC
TABLE I-3 WATERCOURSE RECLAMATION MEASURES
APPENDIX J VEGETATION (RESOURCE-SPECIFIC MITIGATION)
TABLE J-1RESOURCE-SPECIFIC MITIGATION MEASURES FORRARE PLANT COMMUNITIES ENCOUNTERED WITHIN THE PIPELINE CORRIDOR
TABLE J-2RESOURCE-SPECIFIC MITIGATION MEASURES FORWEEDS ENCOUNTERED WITHIN THE PIPELINE CORRIDOR
APPENDIX K WETLANDS (RESOURCE-SPECIFIC MITIGATION)
TABLE K-1RESOURCE-SPECIFIC MITIGATION MEASURES FORWETLANDS ENCOUNTERED WITHIN THE PIPELINE CORRIDOR
APPENDIX L WILDLIFE AND WILDLIFE HABITAT (RESOURCE-SPECIFIC MITIGATION)
TABLE L-1 WILDLIFE FEATURES ENCOUNTERED WITHIN THE PIPELINE CORRIDOR
TABLE L-2WILDLIFE AND WILDLIFE HABITAT ENVIRONMENTAL PROTECTION MEASURES – PROPOSED PIPELINE CORRIDOR
APPENDIX M HERITAGE RESOURCES (RESOURCE-SPECIFIC MITIGATION)
TABLE M-1RESOURCE-SPECIFIC MITIGATION MEASURES FOR SITES OF ARCHAEOLOGICAL POTENTIAL WITHIN THE PIPELINE CORRIDOR
TABLE M-2 RESOURCE-SPECIFIC MITIGATION MEASURES FOR SITES OFPALAEONTOLOGICAL POTENTIAL WITHIN THE PIPELINE CORRIDOR
APPENDIX N SOCIO-ECONOMIC AND AGRICULTURE (RESOURCE-SPECIFIC MITIGATION)
TABLE N-1 RESOURCE-SPECIFIC MITIGATION MEASURES FOR LAND ANDRESOURCE USE FEATURES ENCOUNTERED WITHIN THE PIPELINE CORRIDOR
APPENDIX O AIR QUALITY (RESOURCE-SPECIFIC MITIGATION)
TABLE O-1 RESOURCE-SPECIFIC MITIGATION MEASURES FORAIR QUALITY FEATURES ENCOUNTERED WITHIN THE PIPELINE CORRIDOR
APPENDIX P NOISE (RESOURCE-SPECIFIC MITIGATION)
TABLE P-1 RESOURCE-SPECIFIC MITIGATION MEASURES FORNOISE FEATURES ENCOUNTERED WITHIN THE PIPELINE CORRIDOR
APPENDIX Q TRADITIONAL LAND USE (RESOURCE-SPECIFIC MITIGATION)
TABLE Q-1 RESOURCE-SPECIFIC MITIGATION MEASURES FOR TRADITIONAL LAND ANDRESOURCE USE FEATURES ENCOUNTERED WITHIN THE PIPELINE CORRIDOR
APPENDIX R DRAWINGS
Drawing 1 Access Control - Frozen
Drawing 2 Brush Wind Barrier
Drawing 3 Coir/Straw Log Installation
Drawing 4 Conventional Right-of-Way Configuration
Drawing 5 Cross Ditches and Diversion Berms
Drawing 6 Erosion Control - Rollback in Riparian Areas
Drawing 7 Equipment Cleaning - Compressed Air and High Pressure Water
Drawing 8 Erosion Control Matting/Blanket
Drawing 9 Rooted Stock Selection and Installation
Drawing 10 Log Decking
Drawing 11 Materials Handling at Rail Bores
Drawing 12 Materials Handling at Road Bores
Drawing 13 Mounding in Riparian Areas
Drawing 14 Narrow Down Fencing
Drawing 15 Peatland Wetland - Stub Berms
Drawing 16 Rare Plant Ramp Protection
Drawing 17 Rollback
Drawing 18 Sediment Fence
Drawing 19 Staked Logs/Log Cribwall for Erosion Control
Drawing 20 Straw Crimping
Drawing 21 Streambank Protection - Cobble or Riprap Armouring
Drawing 22 Streambank Protection - Cribwalls
Drawing 23 Streambank Protection - Gabion Baskets
Drawing 24 Streambank Protection - Coniferous Tree Revetment
Drawing 25 Streambank Protection - Grass Roll
Drawing 26 Streambank Protection - Hedge/Brush Layering
Drawing 27 Subdrains
Drawing 28 Temporary Bridge/Rare Plants
Drawing 29 Topsoil or Root Zone Material Salvage - Blade Width/Frozen
Drawing 30 Topsoil or Root Zone Material Salvage in Forest - Full Right-of-Way
Drawing 31 Topsoil or Root Zone Material Salvage - Three-Lift Soils Handling on Cultivated Land
Drawing 32 Topsoil or Root Zone Material Salvage - Three-Lift Soils Handling on Well-Sodded Land
Drawing 33 Topsoil or Root Zone Material Salvage - Trench and Spoil Area
Drawing 34 Topsoil or Root Zone Material Salvage - Trench Width
Drawing 35 Topsoil Salvage on Agricultural Lands - Full Right-of-Way
Drawing 36 Trench Breakers/Ditch Plugs
Drawing 37 Trench Breaker - Watercourse/Wetland
Drawing 38 Shrub Staking and Transplanting
Drawing 39 Vegetation and Slash Berm - Line-of-Sight Break
Drawing 40 Vegetation and Soil Berm - Line-of-Sight Break
Drawing 41 Vegetation Screen
Drawing 42 Vehicle Crossing - Ramp and Culvert
Drawing 43 Watercourse Crossing - Bore or Punch Method (Forested)
Drawing 44 Watercourse Crossing - Bore or Punch Method (Grasslands)
Drawing 45 Watercourse Crossing - Dam and Pump Method
Drawing 46 Watercourse Crossing - Flume Method
Drawing 47 Watercourse Crossing - High Volume Pump Method
Drawing 48 Watercourse Crossing - Horizontal Directional Drill
Drawing 49 Watercourse Crossing - Open Cut Method for Dry/Frozen Watercourses
Drawing 50 Watercourse Crossing - Open Cut Method for Flowing Watercourses
Drawing 51 Weed Control
Drawing 52 Wetland Crossing – Non-frozen and Frozen
Drawing 53 Wind Erosion
APPENDIX S DETAILS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
/549
100%
100% (Reset)
Fit Width
Fit Height
Fit Page
Trans Mountain Expansion Project
An Application Pursuant to Section 52 of the National Energy Board Act
December 2013
Trans Mountain Pipeline ULC
CANADA
Volume
Pipeline Environmental Protection Plan
6b