Condition compliance
Trans Mountain must comply with all of the [certificate/order] conditions, unless the
NEB otherwise directs.
X
X
X
X
X
X
X
X
2
Compliance with commitments
Without limiting Conditions 3, 4 and 6, Trans Mountain must implement all of the
commitments it made in its Project application or to which it otherwise committed
on the record of the OH-001-2014 proceeding.
X
X
X
X
X
X
X
X
3
Environmental protection
Trans Mountain must implement or cause to be implemented, at a minimum, all
of the policies, practices, programs, mitigation measures, recommendations, and
procedures for the protection of the environment included or referred to in its Project
application or to which it otherwise committed on the record of the OH-001-2014
proceeding.
X
X
X
X
X
X
X
X
4
Engineering and safety
Trans Mountain must cause the Project to be designed, located, constructed,
installed, and operated in accordance with, at a minimum, the specifications,
standards, policies, mitigation measures, procedures, and other information included
or referred to in its Project application or to which it otherwise committed on the
record of the OH-001-2014 proceeding.
X
X
X
X
X
X
X
X
5
Certificate expiration (sunset clause)
Unless the NEB otherwise directs
prior to 30 September 2021
, this [certificate/
order] will expire on
30 September 2021
, unless construction of the Project has
commenced by that date.
X
X
X
X
X
X
X
X
No±
Conditions with initial filings due prior to commencing construction, or prior to
commencing construction of specified Project component(s)
CPCN
OC2
OC49
Temp
Pump 1
Pump2
Tanks
Deact
6
Commitments tracking table
Without limiting Conditions 2, 3 and 4, Trans Mountain must implement the
commitments contained within its commitments tracking table and must:
a) file with the NEB, at the following times, an updated commitments tracking
table including the status of each commitment:
i)
within 3 months after the [certificate/order] date;
ii) at least 30 days prior to commencing construction;
iii) monthly, from the commencement of construction until the first month after
commencing operations; and
iv) quarterly thereafter until:
1.
all commitments on the table are satisfied (superseded, complete
or otherwise closed), at which time Trans Mountain must file
confirmation, signed by an officer of the company, that the
commitments on the table have been satisfied; or
2.
6 years after commencing operations, at which time Trans Mountain
must file with the NEB a summary of any outstanding commitments
and a plan and implementation timeline for addressing these
commitments;
whichever comes earlier; and
b) post on its company website the same information required by a), using the
same indicated timeframes; and
X
X
X
X
X
X
X
X
No±
Overarching conditions
CPCN
OC2
OC49
Temp
Pump 1
Pump2
Tanks
Deact