National Energy Board
418
9
Quality Management Plan
Trans Mountain must file with the NEB,
at least 4 months prior to manufacturing
any pipe and major components for the Project
, a Project-specific Quality
Management Plan that includes:
a) material/vendor qualification requirements;
b) quality control and assurance of pipe, fittings, and components that ensure all
materials meet Trans Mountain’s specifications (i.e., processes, procedures,
specifications, random testing, inspection, and test reports);
c) mandatory documentation of process conditions during manufacture and
verification of the conformance of manufacturer material test reports with Trans
Mountain’s requirements;
d) mandatory inspection requirements, inspector competency training, and
qualifications;
e) non-conformance reporting and correction procedures;
f) change management process;
g) commissioning requirements; and
h) material handling requirements during transportation.
X
X
X
X
10
Phased filings
Due to the Project’s large spatial extent, Trans Mountain may wish to commence
Project construction activities at specific locations at different times (i.e., using
a phased approach). This may entail doing so on the basis of pipeline spreads of
defined lengths, or by regions, or work areas of Trans Mountain’s choosing (such as
terminals or pump stations). If Trans Mountain intends to use a phased approach for
Project construction, it must undertake the following:
a) Trans Mountain must file with the NEB,
at least 7 months prior to commencing
construction
, a complete list of construction spreads, regions, or work areas
that, for the duration of Project construction, will serve as the basis by which
Trans Mountain may submit condition filings in a phased approach. Each spread,
region, or work area must be clearly delineated (e.g., by kilometre posts).
b)
As part of its filing for a)
, to aid the NEB in anticipating future submissions,
Trans Mountain must indicate the specific conditions and related spread(s),
region(s) or work area(s) for which it expects to apply this phased approach.
Trans Mountain must file updates to this list
as they are available
.
c) When submitting a filing for any condition using this phased approach, Trans
Mountain must clearly indicate which spread(s), region(s), or work area(s) that
filing applies to.
d) Construction of a particular spread, region, or work area must not proceed until
all pre-construction conditions using this phased approach have been satisfied
for that spread, region, or work area. Prior to commencing construction of the
initial spread, region, or work area, all applicable conditions with more general
pre-construction timing elements must also be satisfied.