No.
Conditions with initial filings due prior to commencing construction, or prior to
commencing construction of specified Project component(s)
CPCN
OC2
OC49
Temp
Pump1
Pump2
Tanks
Deact
Trans Mountain Expansion Project 2016
457
77
Archaeological and cultural heritage assessment – Lightening Rock
Trans Mountain must file with the NEB,
at least 3 months prior to commencing
construction of the pipeline between the Sumas Terminal and the Sumas Pump
Station
, a report on archaeological and cultural heritage field investigations
undertaken to assess the potential impacts of Project construction and operations on
the Lightening Rock site at Sumas, British Columbia. The report must include:
a) a detailed description of the assessment plan that was developed, in
consultation with the Stó:lō Collective, for the involvement of the Stó:lō
Collective in designing and undertaking surveys;
b) a description of the pre-construction archaeological and cultural heritage
surveys conducted at the site, including:
i)
survey methodologies used; and
ii) data and information sources, including information and Aboriginal traditional
knowledge provided by the Stó:lō Collective;
c) a site description, including maps at appropriate scales and levels of detail,
confirming the site boundaries;
d) an assessment of the potential environmental and socio-economic impacts
of project construction and operations on the archaeological resources and
cultural heritage of the site;
e) all associated mitigation measures that are beyond those identified during the
OH-001-2014 proceeding to address any identified impacts;
f) analysis supporting the use of the measures in e), including any additional
relevant reports;
g) confirmation that Trans Mountain will update the relevant Environmental
Protection Plan(s) and Environmental Alignment Sheets to include any relevant
information based on the surveys completed; and
h) a summary of consultations undertaken with the Stó:lō Collective, and
Appropriate Government Authorities, as well as copies of all written comments
that may be provided to Trans Mountain by the Stó:lō Collective or government
authorities. In its summary, Trans Mountain must provide a description
and justification for how Trans Mountain has incorporated the results of its
consultation, including any recommendations from the Stó:lō Collective or
government authorities, into the assessment.
X
X