No.
Conditions with initial filings due prior to commencing construction, or prior to
commencing construction of specified Project component(s)
CPCN
OC2
OC49
Temp
Pump1
Pump2
Tanks
Deact
Trans Mountain Expansion Project 2016
465
94
Consultation reports – protection of municipal water sources
Trans Mountain must file with the NEB,
at least 2 months prior to commencing construction,
and on or before 31 January of each year during construction and of the first 5 years after
commencing operations
, a report on Trans Mountain’s consultations with municipalities and
regional districts, communities, and Aboriginal groups related to the protection of municipal
and community water sources, including those sources currently relied upon and sources
identified for potential future use. Each report must include:
a) the name of the municipality, regional district, community, or Aboriginal group consulted;
b) the methods, dates, and locations of all meetings or consultations;
c) a summary of all issues or concerns raised; and
d) a summary of any steps or measures that have been or will be undertaken, including
groundwater modelling or monitoring, as a result of consultations with municipalities,
regional districts, communities, or Aboriginal groups. This summary must include:
i)
any updates or amendments to maintenance policies, systems, programs,
procedures, practices, and activities aimed at preventing pipeline releases;
ii) the criteria used to identify and select modelling or monitoring locations and
parameters;
iii) results of any modelling or monitoring;
iv) any measures that have been taken to address modelling or monitoring results; and
v) any measures to share or to make accessible to municipalities, regional districts,
communities, or Aboriginal groups data or issues that arise regarding drinking water
(aquifers, groundwater, and well water supplies); or
in the alternative to i)-v) above, an explanation why no further action is required to address or
respond to issues or concerns raised.
X
X
X
X
X
95
Visual Impact Plan
Trans Mountain must file with the NEB,
at least 2 months prior to commencing
construction
, a Visual Impact Plan that includes:
a) the results of any supplemental visual modelling surveys conducted of select
locations that are highly visible to the public, identified in consultation with
Appropriate Government Authorities, and potentially affected Aboriginal
groups and affected landowners/tenants, where the proposed pipeline corridor
deviates from the existing TMPL system right-of-way; and
b) mitigation measures to be implemented, including all relevant measures
committed to throughout the OH-001-2014 proceeding, and any new mitigation
measures resulting from supplementary surveys.
X
96
Reports on engagement with Aboriginal groups – construction
Trans Mountain must file with the NEB,
at least 2 months prior to commencing
construction and every 6 months thereafter until after commencing operations
,
a report on the engagement activities it has undertaken with potentially affected
Aboriginal groups. Each report must include, at a minimum, for each Aboriginal
group engaged:
a) the name of the group;
b) the method(s), date(s), and location(s) of engagement activities;
c) a summary of any issues or concerns raised; and
d) the measures taken, or that will be taken, to address or respond to issues or
concerns, or an explanation why no further action is required to address or
respond to issues or concerns.
Trans Mountain must provide a copy of each report to each group engaged (and
identified in a) above) at the same time that it is filed with the NEB.
X
X
X
X
X
X
X
X