Hydrostatic Testing Plan
Trans Mountain must file with the NEB,
at least 3 months prior to commencing
pressure testing of any Project component
, a Hydrostatic Testing Plan for the
Project that includes:
a) the locations of all water withdrawal and discharge sites;
b) a discussion of any clearing activities or any other associated works, if required,
that will allow for the transportation of the hydrostatic test water;
c) water withdrawal rates;
d) water withdrawal volumes;
e) the flow rate/volume of water at the withdrawal sites; and
f) site-specific mitigation measures to be implemented at the water withdrawal
and discharge sites or at any other locations required to allow for the
transportation of hydrostatic test water, including a description of the water
quality monitoring methods to be used on hydrostatic testing water prior to
discharge; and
g) a description of how Trans Mountain has taken available and applicable
Aboriginal traditional land use and traditional ecological knowledge into
consideration in developing the plan, including demonstration that those
Aboriginal persons and groups that provided Aboriginal traditional land use
information and traditional ecological knowledge, as reported during the
OH-001-2014 proceeding and/or pursuant to Condition 97, had the opportunity
to review and comment on the information.
X
X
X
X
X
114
NDE of final tie-in welds
Trans Mountain must delay NDE of final tie-in welds (i.e.: welds which will not be
subjected to hydrostatic testing) and any repairs to them
for at least 48 hours
following weld completion
. Trans Mountain must include this requirement in the
NDE specification of its Joining Program required by Condition 111.