No.
Conditions with initial filings due during construction / prior to
commencing operations
CPCN
OC2
OC49
Temp
Pump1
Pump2
Tanks
Deact
National Energy Board
484
133
Marine shipping-related commitments
Trans Mountain must file with the NEB,
at least 3 months prior to loading the first
tanker at the Westridge Marine Terminal with oil transported by the Project
,
confirmation, signed by an officer of the company, that it has implemented or caused
to be implemented the following commitments related to oil tanker traffic and
enhanced oil spill response:
a) Enhanced tug escort through developing a tug matrix and including it as part of
Trans Mountain’s Tanker Acceptance Standard. The tug matrix would prescribe
minimum tug capabilities required to escort outbound laden tankers between
the Westridge Marine Terminal and Buoy Juliet, as described in Section 5.3.2.1
of Volume 8A of Trans Mountain’s Project application (Filing A3S4Y4), Trans
Mountain’s response to NEB Information Request No. 1.59 (Filing A60392),
and Trans Mountain’s response to the NEB’s Information Request regarding the
TERMPOL report (Filing A65273).
b) An enhanced marine oil spill response regime capable of delivering 20,000
tonnes of capacity within 36 hours of notification, with dedicated resources
staged within the study area, as described in Volume 8A of Trans Mountain’s
application and Trans Mountain’s response to NEB Information Request No. 1.64
(Filing A3W9H8).
Trans Mountain must also include and report on the above-noted marine shipping-
related commitments in its commitments tracking table (required by Condition 6).
X
134
Updated Tanker Acceptance Standard
Trans Mountain must file with the NEB,
at least 3 months prior to loading the first
tanker at the Westridge Marine Terminal with oil transported by the Project, and
thereafter on or before 31 January of each of the first five years after commencing
operations
, an updated Tanker Acceptance Standard and a summary of any revisions
made to the Standard.
X
135
Slack line flow conditions
Trans Mountain must file with the NEB,
at least 2 months prior to
commencing
operation of Line 1, and at least 2 months prior to applying for leave to open Line
2, respectively
, the following:
a) a list of locations having potential for slack line flow when each of the pipelines
is operated at 100 per cent of its maximum operating pressure (MOP),
80 per cent of its MOP, and 50 per cent of its MOP; and
b) a description of the following regarding detecting and preventing slack line flow
conditions:
i)
operational measures on Line 1 and Line 2; and
ii) design measures on Line 2.
X
X